ADEOTI paving-stone plant in Tori
The new modern paving-stone plant, during the ministerial visit of 6 August 2025.
Duration: 8 min 20
From the heaviest earthworks to surface finishing, our fleet covers every need of our projects.
Earthworks, pavement, concrete, transport and recycling.

Laying asphalt.

Platform grading.

Loading and rehandling.

Aggregate production.

Layer compaction.

Concrete production.

Transporting fresh concrete.

In-place recycling.
Since 1992, ADEOTI SA has made a choice few companies in the sub-region have made: to produce, in its own facilities, all the processed materials that make up a pavement and its structures. This fleet, supplied by leading European and North American manufacturers, is in operation on the Group's projects.
| Type of facility | Number | Makes and models | Combined capacity |
|---|---|---|---|
| Asphalt plants | 4 | Ermont Marini TSM 15 (×2) · Intrame Flowmix 140 (×2) | 580 t/h |
| Emulsion plants | 3 | Ermont Marini EP 10 (×2) · Massenza | 30 t/h |
| Cement-treated gravel mixers | 3 | Schwing Stetter (×2) · SAE Fayat | 1,200 t/h |
| Concrete batching plants | 6 | Frumecar 1000 (×3) · Frumecar 1700 · ORU France · Betonmec | 255 m³/h |
| Slipform machines | 6 | Gomaco 6300 Commander III (×3) · Gomaco GT 3600 · Wirtgen SP250 · Wirtgen SP15 | 12.8 to 25 m/min |
| Paving-stone plant | 1 | Zenith 1500-2-S | 2,400 m²/day |
| Total industrial fleet | 23 | facilities, plus 6 crushing lines |
Manufacturer's rated capacities. Actual output depends on materials, mix design and site conditions.

4 plants · 580 t/h combined
Four plants of 140 to 150 t/h produce asphalt concrete for wearing courses and bituminous gravel. Two plants can supply two work fronts at once, with backup capacity in case of technical downtime.

3 plants · 30 t/h
ADEOTI SA makes its own bitumen emulsions for prime coats, tack coats and surface dressings: no dependence on imports, secure lead times and a formulation adjusted to the substrate and climate.

3 mixers · 1,200 t/h combined
Our Schwing Stetter and SAE Fayat mixers (300 to 500 t/h) produce homogeneous cement-treated gravel with controlled binder content, at the pace of a major linear project.

6 plants · 255 m³/h combined
Six plants of 15 to 70 m³/h supply bridges, box culverts, hydraulic structures, retaining walls and drainage, spread along the route.

6 machines · 12.8 to 25 m/min
Gutters, concrete-lined ditches, kerbs, safety barriers and dividers produced continuously: regular geometry, better durability and output rates far beyond traditional formwork.

Zenith 1500-2-S · 2,400 m²/day
Concrete pavers for town crossings, pavements, junctions, parking areas and bus stops, made and tested in-house.
Our new modern paving-stone plant produces, on an automated line, the concrete pavers and blocks for our urban developments. It received a ministerial visit on 6 August 2025.
The new modern paving-stone plant, during the ministerial visit of 6 August 2025.
Duration: 8 min 20








Reinforcement, machine set-up, concrete feed, finishing: our slipform machines produce gutters and kerbs continuously, with regular geometry and output rates far beyond traditional formwork.
Slipform gutters, concrete batching plant and reinforcement: ADEOTI's industrial capacity in action.
Duration: 4 min 20












Feeder, primary, secondary and tertiary stages, screens and conveyors: complete facilities for producing processed aggregates, operated with our subsidiary OKOUTA CARRIÈRES SA.
| Line | Site | Manufacturers | Target |
|---|---|---|---|
| Line 1 | Sikki | Metso (C120, HP 300) · Nordberg | 2,500 t/day |
| Line 2 | Sinendé | Pegson Telsmith · Speco · Nordberg | — |
| Line 3 | Setto | Sanland · Nordberg | 2,500 t/day |
| Line 4 | Sikki | ROC Impact · Speco | 2,500 t/day |
| Line 5 | Zangnanado | Metso (C120, HP 300) · recycling conveyors | 3,500 t/day |
| Line 6 | Kouandata | Complete line | — |
Grading sizes produced: 0/5 · 0/6 · 4/6 · 5/15 · 6/10 · 10/14 · 14/20 · 15/25 · 25/60 · 0/20 · 0/31.5 · 0/60. Daily and weekly production reporting by site, line and grading.

From the quarry to the wearing course, ADEOTI SA controls the entire road materials production chain.
Mix design, production and testing of materials by our own teams, in our own facilities.
No dependence on third-party plants or external supplies of emulsion or concrete.
Each type of facility has several units: a backup unit can be mobilised.
The depth of our fleet allows several crews to work in parallel and shortens the works schedule.
Ermont, Marini, SAE Fayat, Intrame, Massenza, Schwing Stetter, Frumecar, Wirtgen, Gomaco, Zenith.
OKOUTA CARRIÈRES SA for aggregates, FFA for drilling, geotechnics and special foundations.