Technical references

46 major contracts, FCFA 681.6 bn (USD 1,217 M)

Since 2005, the ADEOTI Group has carried out 46 major contracts in Benin, Togo and Côte d'Ivoire: a solid base of references demonstrating our capacity on major infrastructure projects.

Kota – Kouandé road, 2024

A presence in three countries

37 contractsin Benin
3 contractsin Togo
6 contractsin Côte d'Ivoire
USD 780 MFCFA 436.5 bn in reference contracts since 2016 (7 completed, 5 ongoing)

Large-scale, technically demanding projects

Bridge over Lake Toho, 2024
Bridge over Lake Toho, 2024

Bridge over Lake Toho

A 325 m bridge in 16 spans (2 abutments, 15 piers) built in a lake environment, with access ramps of 225 and 250 m.

Completed in 2024

Kota – Kouandé road, 2024
Kota – Kouandé road, 2024

Kota – Kouandé (43.5 km)

The Atacora road: 20,555 m³ of rock excavation, 37,200 m² of stone pitching, a 45 m bridge, 416 solar street lights.

Ongoing

Guessou Sud – Sinendé road, 2024
Guessou Sud – Sinendé road, 2024

Guessou Sud – Sinendé (58 km)

115,034 m³ of rock cut, 35,000 m of masonry gutters, bridges of about 90 and 105 m.

Ongoing

Nikki – Kalalé – Ségbana road, 2026
Nikki – Kalalé – Ségbana road, 2026

Nikki – Kalalé – Ségbana: 150 km under a single contract

47.5 km paved and 102.7 km of earth road: 562,260 m³ of fill, 3 bridges of 80 m and 2 of 20 m, 2,754 m of box culverts, 635 solar street lights.

Ongoing

Port of Cotonou, 2026
Port of Cotonou, 2026

Port of Cotonou, alongside international groups

Member of the Eiffage Génie Civil Marine, Spie Batignolles Fondations and ADEOTI SA joint venture: design and construction of roads and utility networks.

Dual carriageways and major joint ventures

Prequalified in 2024 by MCA-Benin for the reconstruction of Bohicon – Dassa Zoumè (83 km) as a dual two-lane road, within a joint venture led by Julius Berger Nigeria. Dual carriageway references: Carrefour le Bélier – Sèmè (2 × 14.5 km), Haho boulevard in Lomé (2 × 3.5 km).

Selection: Togo and Côte d'Ivoire

CountryContract
TogoKoumea – Pya – Tchare – Lassa – Soumdina (RN16, 50 km, lot 7) · ADEOTI / CENTRO joint venture
TogoDevelopment and paving of Haho boulevard, Lomé (3.5 km) · Ministry of Public Works
Côte d'IvoireDevelopment and paving of the Adzopé – Yakassé Attobrou 2×1 lane road · MIE · ADEOTI / LRA joint venture
Côte d'IvoireAccess roads to the Abidjan / Vridi freight station · PFCTCAL
Côte d'IvoireRehabilitation of the Yopougon industrial zone (lot 3, North utilities) · AGEDI

The foundations of a track record: Benin, 2005 – 2014

The period in which ADEOTI began building paved roads, port terminals and major urban roads.

PeriodContractProject owner
Mar. 2005 → Apr. 2006Rehabilitation and resurfacing, Djougou – Natitingou road (82 km)MDCTTP
Dec. 2006 → Sep. 2007Construction of a dry port on the OCBN estate and access roadsCOMAN S.A.
Jan. 2008 → Sep. 2010Container terminal, Port of Cotonou (COMAN, lot 1)COMAN S.A.
Mar. 2009 → Nov. 2009Akossombo – Étoile Rouge – Dantokpa – Sobebra – le BélierMDCTTP
Mar. 2010 → Mar. 2011Development and paving of 7 km of urban roads in Porto-NovoMUHRFLEC
Jan. 2011 → Aug. 2011Rehabilitation of Carrefour le Bélier – Sèmè (14.5 km × 2)MDCTTTATP
Mar. 2012 → May 2013Strengthening of the Allada container terminal and access road (3 km)ATRAL
Apr. 2012 → Apr. 2013Paving of the quay edges, Port of Cotonou (lot 2)PAC
Jul. 2014 → Dec. 2015Djèrègbè – Dja-Owodé – Nigeria border (9.672 km)MTPT
Jul. 2014 → Dec. 2015Development and paving of Ouidah – Tori (16.5 km)MTPT

Certificates of satisfactory completion and a detailed list of contracts available on request.

Our partners and clients

Beyond Benin, ADEOTI works in Togo and Côte d'Ivoire, on its own or through joint ventures with local expertise.

Project owners and institutions

  • States: Benin, Togo, Côte d'Ivoire
  • SIRAT-SA: Road Infrastructure and Development
  • Ministries of Public Works and Infrastructure
  • Ministry of Urban Planning (MUHRFLEC)
  • Port Autonome de Cotonou · SOBEMAP · ATRAL
  • SMTC · COMAN S.A.
  • AGEROUTE and AGEDI (Côte d'Ivoire)

Donors and financial partners

  • World Bank
  • African Development Bank (AfDB)
  • West African Development Bank (BOAD)
  • Islamic Development Bank (IsDB)
  • ECOWAS Bank for Investment and Development (EBID)
  • Abu Dhabi Fund (ADFD) · Kuwait Fund (KFAED)
  • Deutsche Bank

An experienced and loyal management team

Our key managers are permanent employees of ADEOTI SA. They have led the Group's major projects and pass on their know-how to the teams.

PositionExperienceYears at ADEOTIReference projects
Project director21 years15 yearsGuessou Sud – Sinendé, Zangnanado – Paouignan, Dogbo – Toviklin
Works manager18 years1 yearGodomey – Akassato interchanges and Vèdoko junction
Deputy works manager20 years20 yearsPort of Cotonou, Tori – Allada – Pahou, Haho boulevard
Structures and bridges engineer15 years14 yearsPort of Cotonou, Ouidah – Hillacondji, Manakoro bridge (Mali)
Geotechnical engineer12 years9 yearsLalo – Abomey – Djidja – Tchetti – Bantè (240 km), Cotonou access roads
HSE and environment manager11 years10 yearsZangnanado – Paouignan, Dogbo – Toviklin
Quality engineer10 years9 yearsGuessou Sud – Sinendé, Dogbo – Toviklin, Tori – Allada – Pahou
Surveying engineer23 years22 yearsBohicon – Tindji – Zakpota, Bélier – Sèmè (dual carriageway), Lokossa